** 學術期刊 Peer-reviewed Journal Paper
- Tzu-Li Chen, James C. Chen, Yin-Yann Chen*, Yu-Jie Chang (2025, Jun). The optimal configuration for various placement machines in PCB assembly lines. Annals of Operations Research, 349(1), 365-396. (SCI)
- James C. Chen, Tzu-Li Chen, Yin-Yann Chen*, Yung-Hsin Su (2025, Mar). Applying a modified adaptive large neighborhood search for truck scheduling and pile assignment in a two-stage sorting system. European Journal of Industrial Engineering, 19(2), 128-161. (SCI)
- James C. Chen, Tzu-Li Chen, Yin-Yann Chen*, Min-Yu Chung (2024, Sep). Multi-resource constrained scheduling considering process plan flexibility and lot streaming for the CNC machining industry. Flexible Services and Manufacturing Journal, 36(3), 946-993. (SCI)
- Yin-Yann Chen, Pourya Pourhejazy, Tzu-Ning Liu (2024, Mar). Line balancing problem with multi-manned workstations and resource constraints: The case of electronics waste disassembly. Cleaner Logistics and Supply Chain, 10, Article 100129. (ESCI)
- Yin-Yann Chen, Tzu-Li Chen, Chun-Chih Chiu, Yi-Jia Wu (2023, Mar). A multi-trip vehicle routing problem considering time windows and limited duration under a heterogeneous fleet and parking constraints in cold supply chain logistics. Transportation Planning and Technology, 46(3), 335-358. (SCI)
- James C. Chen, Yin-Yann Chen*, Tzu-Li Chen, Yu-Chia Yang (2022, Sep). An adaptive genetic algorithm-based and AND/OR graph approach for the disassembly line balancing problem. Engineering Optimization, 54(9), 1583-1599. (SCI)
- James C. Chen, Yin-Yann Chen*, Tzu-Li Chen, Yi-Hsuan Lin (2022, Jul). Multi-project scheduling with multi-skilled workforce assignment considering uncertainty and learning effect for large-scale equipment manufacturer. Computers & Industrial Engineering, 169, Article 108240. (SCI)
- Chen-Yang Cheng, Yin-Yann Chen, Pourya Pourhejazy, Chih-Yu Lee (2022, Feb). Disassembly line balancing of electronic waste considering the degree of task correlation. Electronics, 11(4), 533. (SCI)
- James C. Chen, Yin-Yann Chen*, Tzu-Li Chen, Yi-Hsin Kuo (2019, Jul). Applying two-phase adaptive genetic algorithm to solve multi-model assembly line balancing problems in TFT–LCD module process. Journal of Manufacturing Systems, 52, 86-99. (SCI)
- Yin-Yann Chen*, Chen-Yang Cheng, Jia-Ying Li (2018, Jul). Resource-constrained assembly line balancing problems with multi-manned workstations. Journal of Manufacturing Systems, 48, 107-119. (SCI)
- James C. Chen, Yin-Yann Chen*, Tzu-Li Chen, Jim Z. Lin (2017, Mar). Comparison of simulated annealing and tabu-search algorithms in advanced planning and scheduling systems for TFT-LCD colour filter fabs. International Journal of Computer Integrated Manufacturing, 30(6), 516-534. (SCI)
- Yin-Yann Chen* (2017, Jan). A hybrid algorithm for allocating tasks, operators, and workstations in multi-manned assembly lines. Journal of Manufacturing Systems, 42, 196-209. (SCI)
- James C. Chen, Yin-Yann Chen*, Yu Liang (2016, Oct). Application of a genetic algorithm in solving the capacity allocation problem with machine dedication in the photolithography area. Journal of Manufacturing Systems, 41, 165-177. (SCI)
- Yin-Yann Chen* (2016, Oct). A stochastic programming model to solve the capacity expansion problem considering auxiliary tools: a semiconductor foundry case. Universal Journal of Management, 4(11), 639-643.
- Chen-Yang Cheng, Yin-Yann Chen*, Tzu-Li Chen, John Jung-Woon Yoo (2015, Dec). Using a hybrid approach based on the particle swarm optimization and ant colony optimization to solve a joint order batching and picker routing problem. International Journal of Production Economics, 170, 805-814. (SCI)
- Yin-Yann Chen*, Hsiao-Yao Fan (2015, Dec). An application of stochastic programming in solving capacity allocation and migration planning problem under uncertainty. Mathematical Problems in Engineering, Volume 2015, Article 741329, 16 pages. (SCI)
- Tzu-Li Chen, Chen-Yang Cheng, Yin-Yann Chen*, Li-Kai Chan (2015, Jan). An efficient hybrid algorithm for integrated order batching, sequencing and routing problem. International Journal of Production Economics, 159, 158-167. (SCI)
- Chen-Yang Cheng, Tsung-Yin Ou, Tzu-Li Chen, Yin-Yann Chen (2014, Oct). Transferring cognitive apprenticeship to manufacturing process knowledge management system: A case study of small- and medium-sized coating industry. VINE Journal of Information and Knowledge Management Systems, 44(3), 420-444. (EI)
- Li-Chih Wang, Yin-Yann Chen*, Tzu-Li Chen, Chen-Yang Cheng, Chin-Wei Chang (2014, Oct). A Hybrid Flowshop Scheduling Model Considering Dedicated Machines and Lot-splitting for the Solar Cell Industry. International Journal of Systems Science, 45(10), 2055-2071. (SCI)
- Yin-Yann Chen* (2014, Jun). The order fulfillment planning problem considering multi-site order allocation and single-site shop floor scheduling. Journal of Intelligent Manufacturing, 25(3), 441-458. (SCI)
- Chen-Yang Cheng, Tzu-Li Chen, Yin-Yann Chen (2014, May). An Analysis of the Structural Complexity of Supply Chain Networks. Applied Mathematical Modelling, 38(9-10), 2328–2344. (SCI)
- Chen-Yang Cheng, Tzu-Li Chen, Li-Chih Wang, Yin-Yann Chen (2013, Aug). A genetic algorithm for the multi-stage and parallel-machine scheduling problem with job splitting – A case study for the solar cell industry. International Journal of Production Research, 51(16), 4755-4777. (SCI)
- Tzu-Li Chen, Yin-Yann Chen, Hao-Chun Lu (2013, Aug). A capacity allocation and expansion model for TFT-LCD multi-site manufacturing. Journal of Intelligent Manufacturing, 24(4), 847-872. (SCI)
- Yin-Yann Chen*, Chiung-Wen Shih, Hsiao-Yao Fan (2013, May). The Multi-Site Order Fulfillment Planning Model: A Global Corporation Case Study. Journal of Social and Development Sciences, 4(5), 236-241.
- Yin-Yann Chen*, Tzu-Li Chen, Cheng-Dar Liou (2013, Feb). Medium-term Multi-plant Capacity Planning Problems Considering Auxiliary Tools for the Semiconductor Foundry. International Journal of Advanced Manufacturing Technology, 64(9), 1213-1230. (SCI)
- Cheng-Dar Liou, Yi-Chih Hsieh, Yin-Yann Chen (2013, Jan). A new encoding scheme-based hybrid algorithm for minimising two-machine flow-shop group scheduling problem. International Journal of Systems Science, 44(1), 77-93. (SCI)
- Yin-Yann Chen, Chen-Yang Cheng, Li-Chih Wang, Tzu-Li Chen (2013, Jan). A hybrid approach based on the variable neighborhood search and particle swarm optimization for parallel machine scheduling problems- a case study for solar cell industry. International Journal of Production Economics, 141(1), 66-78. (SCI)
- Yin-Yann Chen* (2012, Jun). The Medium-Term Capacity Planning Problem for TFT-LCD Industry: An Application of Fuzzy Bilevel Programming. International Journal of Future Computer and Communication, 1(1), 79-82. (EI)
- Yin-Yann Chen*, James T. Lin, Tzu-Li Chen (2011, Oct). A Two-phase Dynamic Dispatching Approach to Semiconductor Wafer Testing. Robotics and Computer-Integrated Manufacturing, 27(5), 889-901. (SCI)
- Sonia M. Lo, Yin-Yann Chen, James T. Lin (2009, Dec). One Stop Service—The Case of Senao International Co., LTD.. International Journal of Electronic Business Management, 7(4), 225-240. (EI)
- Yin-Yann Chen*, James T. Lin (2009, Dec). A modified particle swarm optimization for production planning problems in the TFT Array process. Expert Systems with Applications, 36(10), 12264-12271. (SCI)
- Yin-Yann Chen*, James T. Lin (2008, Sep). Hierarchical Multi-Constraint Production Planning Problem Using Linear Programming and Heuristics. Journal of the Chinese Institute of Industrial Engineers, 25(5), 347-357. (EI)
- James T. Lin, Yin-Yann Chen (2007, Jul). A multi-site supply network planning problem considering variable time buckets– A TFT-LCD industry case. International Journal of Advanced Manufacturing Technology, 33(9-10), 1031-1044. (SCI)
- James T. Lin, Yin-Yann Chen (2005, Sep). A Multi-Site Planning Approach for the TFT-LCD Production Chain. International Journal of Electronic Business Management, 3(3), 193-201. (EI)
** 國際研討會論文 Papers for International Conferences
- Yin-Yann Chen* (2020, Jan). The disassembly line balancing problem considering work relatedness. 3rd International Conference on Computers in Management and Business (ICCMB2020), Tokyo, Japan.
- Yin-Yann Chen*, Tzu-Yu Hung (2019, May). Using a Two-Stage Stochastic Programming Model to Solve the Sustainable Supply Chain Network Design under Uncertainty. 2nd International Conference on Innovative Applications in Engineering Technology and Applied Sciences, Tokyo, Japan.
- Yin-Yann Chen* (2018, Apr). Modeling and solving multi-manned assembly line balancing problems with resource constraints. Global Conference on Innovative Strategies in Information Technology and Engineering Management, Tokyo, Japan.
- Yin-Yann Chen, James C. Chen, Yi-Hsin Kuo, Hao-Ning Wu (2018, Apr). A Study of Multi-Model Assembly Line Balancing Problem for TFT-LCD Module Process. 2018 International Symposium on Business and Management (ISBM 2018), Osaka, Japan.
- Yin-Yann Chen, James C. Chen, Yu-Chia Yang, Chien-Fu Huang (2018, Apr). Applying Adaptive Genetic Algorithm and AND/OR Graph to Disassembly Line Balancing Problems. 2018 International Symposium on Business and Management (ISBM 2018), Osaka, Japan.
- Yin-Yann Chen* (2017, Apr). Optimal Resource Configuration and Allocation Planning Problem for Bottleneck Machines and Auxiliary Tools. 2017 International Symposium on Business and Management (ISBM 2017), Kyoto, Japan.
- Yin-Yann Chen* (2016, Aug). A Stochastic Programming Model to Solve the Capacity Expansion Problem Considering Auxiliary Tools: A Semiconductor Foundry Case. International Symposium on Business and Social Sciences (ISBSS), Okinawa, Japan.
- Yin-Yann Chen, James C. Chen, Chieh-Ying Lin, Yu-Xuan Lin (2015, Dec). A Genetic Algorithm for Type-E Assembly Line Balancing Problem in Footwear Industry. The 16th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2015), Ho Chi Minh City, Vietnam.
- Yin-Yann Chen, James C. Chen, Chun-Ju Lin, Hsin-Yu Shih (2015, Dec). Type-III Assembly Line Balancing Problem in Footwear Industry. The 16th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2015), Ho Chi Minh City, Vietnam.
- Yin-Yann Chen, James C. Chen, Yi-Hsin Hu, Qi Hua (2015, Dec). Apply Grouping Genetic Algorithm to Develop an Assembly Line Balancing System for Apparel Industry. The 16th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2015), Ho Chi Minh City, Vietnam.
- Yin-Yann Chen* (2015, Mar). The capacity allocation and migration planning problem in the semiconductor packaging and testing industry. International Conference on Business and Social Sciences, Osaka, Japan.
- Yin-Yann Chen*, Hsiao-Yao Fan, Chiung-Wen Shih, and Po-Han Huang (2014, Mar). The Capacity Planning Problem Considering the Procurement of Bottleneck Machines and Auxiliary Tools. IAENG International Conference on Industrial Engineering (ICINDE'14), Hong Kong.
- Chun-Hsiung Lai, Tzu-Li Chen, Yin-Yann Chen, Chen-Yang Cheng (2013, Dec). An efficient hybrid algorithm for integrated order batching, sequencing and routing problem. The 14th Asia Pacific Industrial Engineering and Management Systems Conference (APIEMS 2013), Cebu, Philippines.
- Li-Chih Wang, Tzu-Li Chen, Yin-Yann Chen, Hsin-Yuan Miao, Sheng-Chieh Lin, Shuo-Tsung Chen (2013, Jul). Genetic Algorithm Approach for Multi-objective Optimization of Closed-loop Supply Chain Network. The Institute of Industrial Engineers (IIE) Asian Conference, Taipei, Taiwan.
- Li-Chih Wang, Tzu-Li Chen, Yin-Yann Chen, Yi-Wen Chen, Allen Wang (2013, Jun). Closed-Loop Sustainable Supply Chain Design under Uncertainties. The 23rd International Conference on Flexible Automation and Intelligent Manufacturing (FAIM 2013), Porto, Portugal.
- Yin-Yann Chen*, Chiung-Wen Shih, Hsiao-Yao Fan (2013, Jun). The multi-site order fulfillment planning model: a global corporation case study. International Conference on Global Business Environment (ICBGE 2013), Bangkok, Thailand.
- Li-Chih Wang, Chen-Yang Cheng, Tzu-Li Chen, Yin-Yann Chen, Chung-Chun Wang (2012, Aug). A Multi-Stage and Parallel-Machine Scheduling Problem for Solar Cell Industry. The 3rd International Asia Conference on Industrial Engineering and Management Innovation, Beijing, China.
- Li-Chih Wang, Chen-Yang Cheng, Tzu-Li Chen, Yin-Yann Chen (2012, Jun). An Integrated Algorithm for Solar Cell Hybrid Flow Shop Scheduling. The 22nd International Conference on Flexible Automation and Intelligent Manufacturing (FAIM 2012), Helsinki, Finland.
- Yin-Yann Chen* (2012, Jun). The Medium-Term Capacity Planning Problem for TFT-LCD Industry: An Application of Fuzzy Bilevel Programming. The 2012 International Conference on Fuzzy Information and Engineering (ICFIE 2012), Hong Kong.
- Li-Chih Wang, Yin-Yann Chen, Chen-Yang Cheng, Chin-Wei Chang, Chung-Hsuan Tsai (2012, Apr). An optimal production scheduling model of hybrid flow shop—a case of solar cell industry. The 23rd Annual Production and Operations Management Society (POMS) Conference, Chicago, Illinois, U.S.A..
- Yin-Yann Chen*, Tzu-Li Chen, Wei-Ling Chen (2011, Jun). The Capacity Allocation Planning and Expansion Policy Problems Considering Auxiliary Tools. International Conference on System Science and Engineering (ICSSE 2011), Macao.
- James T. Lin, Tzu-Li Chen, Yin-Yann Chen, Jeffrey J. Lai (2010, Nov). A Design Methodology for SCOR-Based Supply Chain Simulation. 仿真科學與技術學術研討會, Fuzhou, Fujian, China.
- James T. Lin, Yin-Yann Chen, Tzu-Li Chen (2010, Nov). A Dynamic Dispatching Approach to Semiconductor Wafer Testing. 仿真科學與技術學術研討會, Fuzhou, Fujian, China.
- James T. Lin, Tzu-Li Chen, Yin-Yann Chen (2010, Oct). Medium-term Multi-plant Capacity Planning Problems for Semiconductor Foundry. The 17th IEEE International Conference on Industrial Engineering and Engineering Management (IE&EM 2010), Xiamen, China.
- Yin-Yann Chen* (2010, May). An Analytical Framework for Multi-Site Supply Chain Planning Problems. International Conference on Innovation, Engineering Management and Technology (ICIEMT 2010), Tokyo, Japan.
- Yin-Yann Chen* (2010, Mar). A production planning problem solved by the particle swarm optimization. IAENG International Conference on Industrial Engineering (ICINDE'10), Hong Kong.
- Yin-Yann Chen* (2008, Jul). Multi-site planning problem: A TFT-LCD industry case study. International Conference on Business and Information (BAI2008), Seoul, Korea.
- Yin-Yann Chen* (2008, Mar). The analysis of different production planning decision models in the supply chain network. IAENG International Conference on Industrial Engineering (ICINDE'08), Hong Kong.
- Yin-Yann Chen*, James T. Lin (2007, Dec). Hierarchical Production Chain Planning Problem Based on Multi-constraints. The 8th Asia Pacific Industrial Engineering & Management Systems Conference (APIEMS) and 2007 Chinese Institute of Industrial Engineers Conference, Kaohsiung, Taiwan.
- James T. Lin, Yin-Yann Chen (2006, Jun). Hierarchical Multi-Site Production Chain Planning—A TFT-LCD Industry Case. The 36th International Conference on Computers and Industrial Engineering (ICCIE), Taipei, Taiwan.
- James T. Lin, Yin-Yann Chen (2005, Jun). A Supply Network Planning Problem in a Multi-stage and Multi-site Environment. The 35th International Conference on Computers and Industrial Engineering (ICCIE), Istanbul, Turkey.
- James T. Lin, Wu-Der Jeng, Chih-Hao Su, Yin-Yann Chen (2002, Dec). Scheduling algorithm based on DBR approach for IC test facility. The 4th Asia Pacific Industrial Engineering & Management Systems Conference (APIEMS), Taipei, Taiwan.
- Lieh-Chang Tai, James T. Lin, Wu-Der Jeng, Yin-Yann Chen (2002, Sep). A Dynamic Dispatching Algorithm (DDA) for Semiconductor Wafer Probing. International Conference on eCommerce Engineering (ICeCE), Beijing, China.
** 國內研討會論文 Papers for Domestic Conferences
- 陳盈彥, 陳冠妤 (2025年04月)。半導體封裝廠產能規劃與機台配置最佳化之研究。2025全國管理實務暨學術研討會,健行科技大學,桃園。
- 陳盈彥, 曾朝鴻 (2025年04月)。考量需求不確定性之跨廠區產能擴充與最佳化規劃。2025全國管理實務暨學術研討會,健行科技大學,桃園。
- 陳盈彥, 郭妤倢 (2023年12月)。應用適應性數據驅動方法於城市物流配送車輛路線問題之研究。第十九屆台灣作業研究學會年會暨國際研討會,國立勤益科技大學,台中。
- 陳盈彥, 洪怡婷 (2023年12月)。應用隨機規劃模式求解旅行時間不確定之城市物流配送規劃。第十九屆台灣作業研究學會年會暨國際研討會,國立勤益科技大學,台中。
- 陳盈彥, 徐婕瑀 (2023年12月)。考慮燃油消耗與碳排成本下物流車輛配送路線之研究。第十九屆台灣作業研究學會年會暨國際研討會,國立勤益科技大學,台中。
- 陳盈彥, 陳姿宇 (2023年06月)。考慮燃油消耗成本下多趟次多艙種物流配送路徑之最佳化模型研究。2023工商與公共管理學術研討會,國立臺北商業大學,台北。
- 陳盈彥, 張文 (2023年06月)。應用價值溪流圖與模擬技術改善蛋糕生產線作業流程之研究。2023工商與公共管理學術研討會,國立臺北商業大學,台北。
- 陳盈彥, 謝仁杰 (2023年06月)。應用精實生產與限制理論於製造流程改善之研究-以雲林某醬油工廠為例。2023工商與公共管理學術研討會,國立臺北商業大學,台北。
- 陳盈彥, 林育翎 (2022年05月)。A novel mathematical model of vehicle dispatching strategies for distribution centers with multiple trips, multiple compartments, and time window constraints。2022工業管理與危機管理學術研討會,中華大學,新竹。
- 陳盈彥, 蕭守心 (2021年12月)。具時窗限制之多趟次多艙種車輛途程問題。2021北商大學術論壇經營與管理實務研討會,國立臺北商業大學,台北。
- 劉子寧, 陳盈彥* (2020年11月)。資源限制下考慮工作熟練度之多人工作站拆卸線平衡問題。中國工業工程學會年會暨研討會,國立雲林科技大學,雲林。
- 張晉, 陳盈彥* (2020年11月)。具有不同拆卸作業關聯度下之多人工作站拆卸線平衡問題。中國工業工程學會年會暨研討會,國立雲林科技大學,雲林。
- 吳怡佳, 陳盈彥* (2020年11月)。具時窗之多趟次車輛途程問題。中國工業工程學會年會暨研討會,國立雲林科技大學,雲林。
- 林宜萱, 陳盈彥* (2020年03月)。冷鏈物流車配送路徑規劃與派車最佳化問題之研究。2020財務金融與管理研討會,南華大學,嘉義。
- 李芷毓, 陳盈彥* (2019年11月)。考量工作關聯度之拆卸線生產平衡問題。中國工業工程學會年會暨研討會,國立台北科技大學,台北。
- 陳盈彥, 陳俞安 (2019年11月)。考慮操作員工作熟練度下之拆卸線生產平衡問題。中國工業工程學會年會暨研討會,國立台北科技大學,台北。
- 陳盈彥, 邱榮書 (2019年04月)。多產品之多人工作站生產線平衡問題研究。2019全球商業經營管理學術研討會,正修科技大學,高雄。
- 李芋瑩, 陳盈彥* (2017年12月)。以人員配置效益為目標之多人工作站生產線平衡問題。中國工業工程學會年會暨研討會,義守大學,高雄。
- 黃大銘, 陳盈彥* (2017年12月)。應用遺傳演算法求解資源限制下多人工作站生產線平衡問題之研究。中國工業工程學會年會暨研討會,義守大學,高雄。
- 陳盈彥, 李佳嫈 (2017年04月)。考慮資源限制下多人工作站生產線平衡問題之模型。2017工程技術、管理科學與教育研討會,東南科技大學,台北。
- 黃紹茹, 陳盈彥* (2017年04月)。考慮作業員配置效益之多人工作站生產線平衡問題。2017現代管理與創新國際學術研討會,明新科技大學,新竹。
- 陳盈彥, 沈家豪 (2015年12月)。紡織成衣業考量成本因素下生產線平衡問題。2015彰雲嘉大學校院聯盟學術研討會,國立中正大學,嘉義。
- 陳盈彥*, 邱達暐 (2014年12月)。應用兩階段隨機規劃探討半導體封裝產業之產能規劃問題。2014北商學術論壇-國際經營與管理研討會,國立臺北商業大學,台北。
- 陳盈彥*, 范筱瑤 (2013年12月)。應用隨機規劃模式求解具有不確定性之產能配置與搬移規劃問題。中國工業工程學會年會暨研討會,國立屏東科技大學,屏東。
- 陳盈彥*, 施瓊雯 (2013年12月)。產能配置與搬移規劃問題之研究-以半導體封裝測試產業為例。中國工業工程學會年會暨研討會,國立屏東科技大學,屏東。
- 陳盈彥*, 黃柏翰 (2013年12月)。綠色供應鏈網路設計問題之兩階段隨機規劃模式。2013彰雲嘉大學校院聯盟學術研討會,環球科技大學,雲林。
- 王立志, 陳盈彥, 蔡忠軒, 李承玫 (2012年12月)。考量碳排放之綠色供應鏈生產規劃模式-以矽晶太陽能電池產業為例。中國工業工程學會年會暨研討會,大葉大學,彰化。
- 陳盈彥*, 洪子育 (2012年12月)。應用兩階段隨機規劃模式求解具有不確定性之永續供應鏈網路設計問題。中國工業工程學會年會暨研討會,大葉大學,彰化。
- 陳盈彥*, 陳姿伶, 陳建銘 (2012年12月)。半導體封裝測試產業之產能配置模式。中國工業工程學會年會暨研討會,大葉大學,彰化。
- 陳盈彥*, 徐詩婷 (2012年03月)。考慮擴充瓶頸機台與附屬工具之隨機產能規劃問題。產業創新與經營學術研討會,明道大學,彰化。
- 陳盈彥*, 林玉姍 (2012年03月)。應用二階規劃求解中期產能規劃問題之研究-以晶圓代工廠為例。財金會計暨商管決策國際研討會,南台科技大學,台南。
- 陳盈彥*, 吳伯軒 (2011年12月)。應用二階規劃求解中期產能規劃問題之研究─以TFT-LCD產業為例。中國工業工程學會年會暨研討會,明新科技大學,新竹。
- 陳盈彥*, 徐詩婷 (2011年12月)。應用TOPSIS於台灣太陽能產業經營績效之研究。第十屆北商學術論壇-經營與管理研討會,國立台北商業技術學院,台北。
- 陳盈彥*, 陳韋伶 (2010年12月)。考慮擴充瓶頸機台與附屬工具之中期產能規劃問題。中國工業工程學會年會暨研討會,南台科技大學,台南。
- 陳盈彥*, 陳韋伶 (2010年04月)。應用TOPSIS於我國TFT-LCD產業經營效率之研究。2010現代管理與創新學術暨TOC限制管理研討會,明新科技大學,新竹。
- 陳盈彥*, 吳伯軒 (2010年03月)。應用層級分析法與灰關聯建構電影院顧客滿意度評比模式-以西門町地區為例。資訊與管理應用研討會,元培科技大學,新竹。
- 羅明琇, 陳盈彥, 林則孟 (2009年12月)。服務深度與廣度的提升-神腦國際案例。第十五屆服務業管理研討會,國立政治大學,台北。
- 陳盈彥*, 王宏軒, 郭盈賢 (2009年12月)。陣列廠迴流生產環境中光罩與機台配置問題之研究。中國工業工程學會年會暨研討會,逢甲大學,台中。
- 林則孟, 羅明琇, 陳盈彥 (2009年09月)。創新服務,準確無誤-神腦國際案例。產業電子化產學合作研討會,國立台北科技大學,台北。
- 林則孟, 蔡建基, 陳盈彥, 陳子立 (2008年12月)。考量等候時間限制之半導體爐管機台派工法。中國工業工程學會年會暨研討會,中原大學,桃園。
- 林則孟, 周俐君, 陳子立, 陳盈彥 (2008年12月)。晶圓代工廠多廠區之中期產能規劃問題。中國工業工程學會年會暨研討會,中原大學,桃園。
- 林則孟, 陳盈彥 (2006年12月)。多廠區供應網路規劃之研究。中國工業工程學會年會暨研討會,東海大學,台中。
- 林則孟, 陳盈彥 (2004年12月)。階層式供應鏈多廠區生產規劃方法。中國工業工程學會年會暨研討會,國立成功大學,台南。
- 林則孟, 陳盈彥, 陳恩齊 (2004年12月)。多廠區生產規劃問題之分析。中國工業工程學會年會暨研討會,國立成功大學,台南。
- 林則孟, 陳盈彥 (2004年06月)。多階段供應鏈之整合性生產規劃與排程架構。產業電子化運籌管理學術暨實務研討會,國立高雄第一科技大學,高雄。
- 林則孟, 黃建中, 陳子立, 陳盈彥 (2003年07月)。TFT-LCD多廠區生產鏈之生產規劃架構。產業電子化運籌管理學術暨實務研討會,逢甲大學,台中。
** 其他著作
- 羅明琇, 陳盈彥, 林則孟 (2012年01月) "神腦國際—一站式服務",台灣運籌管理案例,中國人民大學出版社。
- 羅明琇, 陳盈彥, 林則孟 (2010年04月) 神腦國際—One Stop Service,管理評論,29(2),pp.87-103。(TSSCI)
- 陳盈彥*, 郭盈賢 (2010年03月) 陣列廠光罩重新配置於瓶頸機台之研究分析。國立虎尾科技大學學報,29(1),pp.1-10。
- 林則孟, 蔡建基, 陳盈彥*, 陳子立 (2009年07月) 考量等候時間限制之半導體爐管機台派工法則。先進工程學刊,4(3),pp.273-278。
- 林則孟, 羅明琇, 陳盈彥 (2009年) "神腦國際-One Stop Service", 光華管理個案收錄庫(個案編號:1-09017-11) (榮獲評選為2011年優良教學個案)。
- 陳盈彥, 賴峰民, 朱延智 (2008年) "產業分析",中華創業育成協會委辦教材編寫計畫(97年度培育育成專業人才計畫)。